Infrastructure Works:
Bringing the land or virgin lots through the construction of drains, swales, pumping stations, internal roads, electrification, so that they are ready for cultivation.
Adequacy:
The process in which the soil is left ready for planting, including the following tasks:
- Topography: Define the area, soil features and viability of the crop to be planted.
- Design: In the topographic survey and its projection.Design: In the topographic survey and its projection.
- Leveling: definition of the slopes of the land.